ALQ120 Stationary Asphalt Mixing Plant Was Finshed Installation In Malaysia

ALQ120 Stationary Asphalt Mixing Plant Was Finshed Installation In Malaysia

Client’s project: Highway construction project. Case brief information: Our ALQ120 asphalt mixing plant was been finished installation in October 2022. Our Malaysian client bought it for their bridge and road construction project. They ordered this asphalt mixing plant in June 2021 and it was delivered to Malaysia in August 2021 and installed before their project … Read more

ABT80C Diesel Engine Concrete Trailer Pump Was On The Way To Malaysia

ABT80C Diesel Engine Concrete Trailer Pump Was On The Way To Malaysia

This is the second time this Malaysia client ordered from Aimix group. This time he bought one set of 80 m³ concrete trailer pump and one concrete placing-boom machine from us. And these machines will be used in Puchong city for building construction project. How Do Our Malaysia client Contact With Aimix Group? The first … Read more

AS3.5C Self Loading Concrete Mixer Was Sent To Malaysia

Aimix AS3.5C self loading concrete mixer was finished manufacturing and has been loading to container at January 20th, 2022. It will be sent to Miri city after 7-10 days delivery by sea transportation. This is the second time of this Malaysia client to buy Aimix machine, he used to buy one concrete block making machine … Read more

ABM4S Concrete Block Making Machine Was Transported To Malaysia

Aimix ABM4S concrete block making machine was ready to be transport to Bintulu city in Malaysia in January 2022. It will be used for brick production in local brick factory as it was delivered to Malaysia. This block production line can manufacture 20000-30000 bricks per day.  Our Malaysia client first quote block making machine in … Read more

ABT40C Concrete Trailer Pump Was Delivered To Malaysia

Aimix 40 m³/h diesel engine concrete trailer pump was ready to transported to Kota Kinabalu Malaysia in Dec 10th, 2021.  This concrete trailer pump will be delivered to local city after 7-14 days sea transportation. Our Malaysia client bought it for his 5-6 floors building construction project. We will help for later operation training & … Read more